Monday, May 21, 2012

Anderson Bridge surface work beginning

Boating impacts soon to come but in the meantime, see this informaton on upcoming surface (or road level) work on Anderson Bridge


Beginning Tuesday, May 29, 2012 at 7 AM, MassDOT crews will begin road work on the Anderson Memorial Bridge, which carries North Harvard Street over the Charles River, between Cambridge and Boston.  During the work, the downstream sidewalk will be closed and traffic will be reduced to one lane in each direction on the bridge until further notice. Bicyclists will need to share the eastbound and westbound lanes.

Appropriate signs, channelizing devices and traffic control measures will be used to guide drivers through the work zone. 

MassDOT encourages drivers to allow extra time for their trips and to reduce speed and use caution when travelling through the work zone.

No comments:

Post a Comment